CS Verma, Chairman of the state-run SAIL recently inaugurated a coke oven battery at the Rourkela Steel Plant, which is being modernised at an investment of Rs 12,000 crore. The battery is top charged having compound twin flue, under jet, regenerative heating with partial recirculation of waste gases. SAIL invested around Rs 1,40
FlashNews:
Air India and IHG Hotels & Resorts Forge Loyalty Partnership
RVNL Emerges Lowest Bidder for ₹40.49 Billion EPC Package in Odisha
ISRO’s GSLV-F17 Launches EOS-05, India’s First Geosynchronous Imaging Satellite
Inox Wind Secures ₹7.55 Billion Repeat Order from Indian Oil
FLY91 Signs $1 Billion ATR Order to Drive Regional Aviation Growth
Esri Launches Linux‑Based GeoSARAL to Tap India’s Expanding GIS Market
Tata Power Commissions 400 kV Jalpura-Khurja Corridor to Strengthen NCR Grid
UrbanVault Expands into Chennai with 100,000 Sq. Ft. Across Three Properties
Naidu Chairs High‑Level Committee to Strengthen Aircraft Leasing and Financing
Windergy India 2026: Wind Sector Targets 100 GW with Manufacturing, Offshore and Repowering
RVNL Charts Diversified Growth with Strong Order Book and Execution
Air India Express Unveils New Uniforms Inspired by India’s Cultural Heritage
NHAI Tightens AI-Machine Construction Norms
Power Investments to Drive 100-200 bps Revenue Growth for Large EPC Firms
Air India Expands Easy Connect from Ahmedabad, Linking Gujarat to 26 Global Destinations
AM/NS India, ICAR‑IARI Partner on Sustainable Use of Iron Ore Tailings in Agriculture
POWERGRID Holds 37th AGM, Showcases Strong Growth and High System Availability
‘Logistics growth will mirror India’s manufacturing momentum’
IndiGo Ventures Backs Sarvam to Drive AI in Aviation
Home » Rourkela Steel Plant
Tag: Rourkela Steel Plant
RSP to complete expansion, modernisation project
Rourkela Steel Plant (RSP) may be able to increase its steel output as it is almost completing the Rs 12,000 crore expansion project, which would double its production capacity from 2 mn t to 4.5 mn tpa (million tonne per annum) of hot metal. The project would also increase its crude steel and saleable steel capacity. The company is also expected to commission the new 4,060 cubic metre blast furnace, large

