The Bangalore Development Authority (BDA), which is building a signal-free corridor between Sirsi Circle and Agara, plans to complete the restoration work on Sarjapur Road and 80-feet road in four months. The announcement has brought some cheers to the residents of Koramangala and other road users.
FlashNews:
IndiGo to Begin Guwahati-Bangkok Flights, Expanding Northeast India’s Global Reach
Suhora Technologies Launches Open Satellite Platform to Support Nepal Flood Response
WABAG Wins RIL Repeat Order for Advanced ETP at Jamnagar
Homegrown Airtel Cloud Seeks to Support India’s Sovereign Manufacturing AI
Air India’s VT‑AWD Dreamliner Arrives After Completing 500 Checks
RVNL Secures ₹90.3 Billion Order for Rail Connectivity to Buxar Thermal Power Project
Air India and IHG Hotels & Resorts Forge Loyalty Partnership
RVNL Emerges Lowest Bidder for ₹40.49 Billion EPC Package in Odisha
ISRO’s GSLV-F17 Launches EOS-05, India’s First Geosynchronous Imaging Satellite
Inox Wind Secures ₹7.55 Billion Repeat Order from Indian Oil
FLY91 Signs $1 Billion ATR Order to Drive Regional Aviation Growth
Esri Launches Linux‑Based GeoSARAL to Tap India’s Expanding GIS Market
Tata Power Commissions 400 kV Jalpura-Khurja Corridor to Strengthen NCR Grid
UrbanVault Expands into Chennai with 100,000 Sq. Ft. Across Three Properties
Naidu Chairs High‑Level Committee to Strengthen Aircraft Leasing and Financing
Windergy India 2026: Wind Sector Targets 100 GW with Manufacturing, Offshore and Repowering
RVNL Charts Diversified Growth with Strong Order Book and Execution
Air India Express Unveils New Uniforms Inspired by India’s Cultural Heritage
NHAI Tightens AI-Machine Construction Norms
Home » signal-free corridor
Tag: signal-free corridor
Noida Authority to build a double U-turn at sector 15A
Paving way for providing a signal-free corridor and streamlining traffic flow between Delhi and the Noida-Greater Noida Expressway, the Noida Authority has managed to get the design for the double U-turn on the road running in front of Sector 15A approved. The proposal was in a limbo for the last two months over the issue of felling of 60 trees in the area.

