India Ratings and Research agency has maintained a negative outlook on the infrastructure sector for FY-18, with varied outlooks on individual sectors.
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Home » thermal power capacity
Tag: thermal power capacity
Govt asks CIL to supply coal for another 18K mw plants
The government has asked Coal India to supply fuel to an additional 18,000 megawatts of new thermal power capacity that will come up by March 2015, but the state firm feels it will not need to supply any additional coal.
Extra coal supplies may not be really required. CIL has been given to understand that the extra 18,000 mw that has been added to the list of supplies are not likely to come up before the deadline of March 2015. Beyond the deadline we do not know yet, CIL Chairman S Narsing Rao

