There are no cracks on Dwarka-Noida City Centre (Line 3) Metro train route, The Delhi Metro Rail Corporation (DMRC) has stated on November 14. It also denied all media reports on the cracks. DMRC made it clear that they were signs of epoxy used in repairing work.
DMRC said that the reported cracks are not actually cracks but these are signs of epoxy used in repairing work done in the year 2005.
The repairs were done by DMRC during erection of span in the year 2005 before opening of the line for public and these repairs are standing well since then.
Leave a Reply
You must be logged in to post a comment.