Coal production increased from 556.4 MnT in 2012-13 to 610.8 MnT during 2014-15, Piyush Goyal, Minister of State (IC) for Power, Coal & New and Renewable Energy, said. The Minister stated that as per the coal ministry´s annual plan document of 2015-16, the annual target for overall coal production for 2015-16 is fixed at 700 MnT. An action plan has also been drawn up to achieve production of the stated target of 1,000 MnT by 2019-20. As on April 1, 2015, a total of 81,049 MnT of geological resources of coal reserves had been estimated in Jharkhand by the Geological Survey of India. The Minister said in order to increase production in Jharkhand, the focus is to facilitate environment and forest clearances, assist with land acquisition and coordinate with the Railways for moving coal.
FlashNews:
Genesys International Q1 Profit Surges 32% on Strong Mapping Demand
Asia-Pacific to Drive 33% of Global Regional Jet Demand by 2045: Embraer
India Achieves 100 GW Solar PV Milestone with ALMM-Driven Expansion
Air India Accelerates $400 Million Fleet Retrofit Programme Across Widebody and Narrowbody Aircraft
ONGC Q1 FY2026 Net Profit Rises 18.2% to ₹115.5 Billion on Strong Gas Realisations and Offshore Gains
Centre Defends Ethanol Blending Programme Amid Mileage Concerns; Highlights $16.5 Billion Forex Savings
Suzlon Energy Reports 62% Surge in EBITDA to ₹5.99 Billion in Q1 FY2026
Inox Green Secures Long-Term O&M Deal for 182 MW Wind Projects
Adani Group Expands MRO Capabilities with Indamer Technics Acquisition
PixxelSpace-Led Consortium to Build India’s First Indigenous Commercial EO Satellite Constellation
India’s Maritime Framework Gets Legislative Boost with Coastal Shipping Bill Passage
IRB Infra and InvIT Projects Post 10% Growth in July 2025 Toll Collections
India Modernises Maritime Laws with Merchant Shipping and Sea Cargo Bills Passed by Parliament
India Sets Global Record with $0.64/kg Green Ammonia Price Under Hydrogen Mission
IndiGo Starts Construction on One of India’s Largest MROs in Bengaluru
SDHI to Manufacture Varex Cargo Inspection Systems in India
Mumbai-Ahmedabad Bullet Train: Sabarmati Bridge Rises to 36 Metres
Tata Power Profit Rises 6% in Q1 FY2026 on Strong Renewable and Distribution Gains
Suzlon Wins 381 MW Order for Zelestra’s First FDRE Wind Project in India
Home » Coal production up in 2014-15: Goyal
Coal production up in 2014-15: Goyal
Coal & Mining
September 1, 2015September 1, 2015

Leave a Reply
You must be logged in to post a comment.