The Airports Authority of India (AAI) has received environment clearance for extension of runway at Rajahmundry airport in Andhra Pradesh, which is estimated to cost Rs 181.45 crore. The existing airport at Madhurapudi village is currently handling about 12 operations daily and the operating capacity is about 225 passengers an hour.
FlashNews:
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ₹90 Billion Growth for FY2026‑27
Star Air Launches 70 Weekly Flights, Introduces First‑Ever Direct Mundra-Delhi NCR Route
India’s Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
“RVNL Delivers 17,000 km Rail Projects, Executes ₹2 Trillion Infrastructure:” Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puri’s Doha Visit
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Author: admin (Infratructure Today)
CIL may miss output target by 20 MT this fiscal
Coal India is likely to miss its production target by 20 million tonnes (MT) and may end up producing up to 578 MT this fiscal due to a host of issues, including evacuation and demand-supply, a top official has said.
L and T, Afcon bag Rs 1,675-crore order from Ahmedabad Metro
Larsen & Toubro (L&T) and Afcon Infrastructure Ltd have bagged Rs 1,675-crore work of constructing the underground section of the Ahmedabad Metro. This is the costliest civil work to be undertaken in the first phase of the Rs 10,700-crore Metro rail project.
Welspun Steel gets green nod for Rs 14,690-cr Gujarat project
Welspun Steel Ltd (WSL) has received environmental clearance for setting up an integrated steel plant with production capacity of 3 million tonnes (MT) per annum in Gujarat at an estimated cost of Rs 14,690 crore.
Govt gets Rs 1.15 cr for regional air connectivity fund
The government has garnered more than Rs 1.15 crore towards funds for the regional air connectivity scheme, Civil Aviation Minister Ashok Gajapathi Raju has said.
India has 80 MT of coal stocks at power plants and mines
India has total coal stocks of 80 million tonnes (MT) at its power plants and coal mines put together at the end of February, thanks to the ongoing slump in the demand for power from distribution utilities and the low capacity utilisation of thermal power stations.
A2Z Infra bags Rs 222-cr contract from Chhattisgarh utility
A2Z Infra Engineering has said that it has won three contracts worth over Rs 222 crore from Chhattisgarh State Power Distribution Company Ltd.
Mines auction to fetch states Rs 1.5 lakh crore in 2017-18
Mines auction is likely to add Rs 1.5 lakh crore to statesÂ’ kitty in 2017-18, Mines Secretary Arun Kumar has said. The first tranche of auctions, which started last year, saw bidding of 21 mine blocks that fetched Rs 73,000 crore to states.
India to accelerate $ 200 billion smart cities projects
When the 60 winning cities (with proposals worth over Rs 1.31 lakh crore) become smart, it is expected to positively impact the lives of 72 crore urban population. While Rs 1.05 lakh crore will be spent on area-based development plans, Rs 26,141 crore will be spent on pan-city solutions in the next five years.
Mitsubishi Hitachi Power SystemsÂ’ “MHPS-TOMONI” unlocks advantages of digital power plants
MHPS-TOMONI is a comprehensive family of digital solutions tailored to fit each customer's priorities at the power plants they operate.

