Farmers in drought-prone Chitradurga are preparing to tap solar energy in a big way to satiate the energy needs of the State with a 5,000 MW mega solar energy park. This will be the biggest in the state when completed. The project, envisaged by Renewable Energy Development Trust (RED-T), with the participation of farmers as partners, needs 40,000 acre spread over 16 villages.
FlashNews:
Vikram Solar Rolls Out First Module at Tamil Nadu Mega‑Facility
AI‑Driven Governance for Capital Projects
India Needs a Comprehensive Approach to Data Sovereignty and Resilience: AS Kiran Kumar
Why India’s Logistics Costs Will Not Fall Through Infrastructure Alone
PM Modi to Dedicate HPCL Rajasthan Refinery, India’s First Greenfield Integrated Complex
Mumbai Port Unveils ₹50.29 Billion Projects on 154th Foundation Day
RVNL Completes Sitafalmandi-Lallaguda Chord Line, Boosting Hyderabad Rail Connectivity
Tata Power Commissions 100.8 MW Jewali Wind Project in Maharashtra
Skyroot Sets Launch Window for India’s First Private Orbital Rocket
India’s ACME Group Seals Landmark Green Ammonia, Methanol Deals with Japan
Indian Railways Posts 4% Freight Growth in June 2026
India, Japan Join Hands to Build Energy Resilience
Adar Poonawalla Family Office Invests ₹700 Crore in Inox Clean Energy
India-EU Set to Deepen Cooperation on Sustainable Ship Recycling
Saleem Ahmad Takes Additional Charge as CMD of IRCON, Strengthening Synergy with RVNL
India’s WABAG Secures Vienna Order for Donauinsel Water Works Expansion
Tech Cuts Mishandled Bag Rates by 23%, But $6.3 Billion Cost Persists: SITA
SK Sinha Appointed Director Finance at GAIL, Bringing Three Decades of Expertise
NHAI to Empanel IITs for Independent Proof Checking of Bridge Designs
Home » Biggest Solar Park to Be Set Up With Farmers´ Blessings
Biggest Solar Park to Be Set Up With Farmers´ Blessings
Power & New and Renewable Energy
December 1, 2015December 1, 2015


Leave a Reply
You must be logged in to post a comment.