New airport terminal to be ready by 2021 The proposed work of Trichy International airportÂ’s terminal building, which is touted to be a first-of-its-kind in the country, is said to be completed by 2021. Without affecting the existing flight operations at the land available with the Airport Authority of India (AAI), the work on the new terminal building has already started. The new terminal will have a capacity to handle 3.63 million passengers per annum, with two-level air-conditioned modular integrated building having an area of 61,634 sq m.
FlashNews:
RECPDCL Hands Over ₹ 8.40 Billion Luhri Transmission SPV to Terralight Solar
RVNL Secures ₹1.61 Billion Signalling Contract from East Coast Railway
Get Solar in 60 Seconds: India’s Digital Push to Power Rooftop Revolution
DFCCIL Rapid Cargo Debuts on WDFC with Amazon Onboard
Automation, Sustainability and Compliance: The New Blueprint for India’s Logistics Parks
India’s GCC Work Portfolio Moves Up Value Chain, Awfis‑Zinnov Report
TVS ILP Signs ₹10 Billion MoU with Tamil Nadu to Boost Industrial Infrastructure
India Tops APAC in AI Adoption, Autodesk Report Finds
SDHI Secures Svitzer Contract to Build Four Advanced TRAnsverse 3200 Tugs
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
Home » New airport terminal to be ready by 2021
New airport terminal to be ready by 2021
Aviation & Airports
October 12, 2018June 9, 2021


Leave a Reply
You must be logged in to post a comment.