The first unit of the 2×363.3 ONGC Tripura Power Corporation (OTPC) at Palatana in Tripura, which is on trial run, is set to start commercial operations by mid-February, provided the EPC contractor BHEL succeeds in stabilising the unit. OTPC is confident to offer adequate load to run the unit at full capacity as the transmission line from Palatana to Silchar in Assam already having been commissioned and on course to be extended up to Byrnihat in Meghalaya soon.
FlashNews:
Kamarajar Port Joins Visakhapatnam as Indiaâs Second 18âMetre DeepâDraft Port
El NiÃąo Cuts 13 aGW Hydropower Across Asia, Forcing Coal and LNG Reliance
CUMI Named Armour Partner for DRDOâs Indigenous Vikram VT21 Combat Vehicles
CleanMax Achieves Record 530 MW Commissioning in Q1 FY2027, Expands Portfolio to 4.2 GW
POWERGRID Secures Landmark ÂĨ80 Billion JBIC Green Loan for Clean Energy Push
Vikram Solar Rolls Out First Module at Tamil Nadu MegaâFacility
AIâDriven Governance for Capital Projects
India Needs a Comprehensive Approach to Data Sovereignty and Resilience: AS Kiran Kumar
Why Indiaâs Logistics Costs Will Not Fall Through Infrastructure Alone
PM Modi to Dedicate HPCL Rajasthan Refinery, Indiaâs First Greenfield Integrated Complex
Mumbai Port Unveils âđ50.29 Billion Projects on 154th Foundation Day
RVNL Completes Sitafalmandi-Lallaguda Chord Line, Boosting Hyderabad Rail Connectivity
Tata Power Commissions 100.8 MW Jewali Wind Project in Maharashtra
Skyroot Sets Launch Window for Indiaâs First Private Orbital Rocket
Indiaâs ACME Group Seals Landmark Green Ammonia, Methanol Deals with Japan
Indian Railways Posts 4% Freight Growth in June 2026
India, Japan Join Hands to Build Energy Resilience
Adar Poonawalla Family Office Invests âđ700 Crore in Inox Clean Energy
India-EU Set to Deepen Cooperation on Sustainable Ship Recycling
Home » ONGC Tripura Power unit
ONGC Tripura Power unit
Power & New and Renewable Energy
February 1, 2013February 1, 2013


Leave a Reply
You must be logged in to post a comment.