National Water Resources Council adopted the National Water Policy (2012) after examining the suggestions of the state governments. This information was given by Union Water Resources Minister Harish Rawat in the Rajya Sabha recently. During the sixth Meeting of the National Water Resources Council, held on December 28, 2012 at New Delh
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Home » 2012
Tag: 2012
ONGC bids for stake in Angola oil block
Oil and Natural Gas Corporation (ONGC) has bid for US energy major Exxon Mobil’s 25 per cent stake in a deep-sea oil block in Angola.
Bhel cuts down on delivery time
Beginning April 2011, BHEL will deliver boilers, two months ahead of the existing schedule and will aim to reduce the schedule by a total of four months for orders to be booked beginning 2012-13.

