All 4 bids opened on negative VGF exceeding estimation by far. NHAI opened four National Highway bids (on BOT) over the past two working days--three on Friday, 18 November and one on Monday, 21 November. The four have all been on premium, also called negative Viability Gap Funding (VGF) of varying amounts.
FlashNews:
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalās 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Japanās JFE Engineering Invests Ā„750 Million in Antony Waste; First FDI in Indiaās Waste-to-Energy Sector
Tag: Chhattisgarh
Power Grid on a roll
The new Chairman and Managing Director of Power Grid Corporation of India follows good examples before him and therefore, as he steps into his predecessor SK ChaturvediĆ¢ā¬ā¢s shoes, he also enters the new challĆĀenge of rural transmission and new and replacement technology such as high voltage (HV) cabling and smart grids.
$750-mn ADB loan for Powergrid project
The Asian Development Bank (ADB) will extend a loan of $750 million for the national power transmission improvement project of Power Grid Corporation of India. The loan will finance the project for bulk transmission of 3,000 MW of electricity from independent power producers in Chhattisgarh to areas in the north, including Delhi.
ADB loan to Railways
The Asian Development Bank (ADB) would extend loans of up to $500 million to Indian Railways to improve services along some of the busiest freight and passenger routes.
Setback for Chhattisgarh UMPP
The 4,000-MW Chhattisgarh ultra mega power project (UMPP) in Sarguja received a major bow.
Ultra mega steel projects on anvil
The Ministry of Steel is planning to set up ultra mega steel plants (UMSPs) on fast track in mineral-rich states.
NMDC to acquire coal mine
NMDC's has moved closer in its bid to acquire a coal mine in the US which will feed its proposed steel plants in India.
Short-lived glory
As the pace of power generation heats up, the race to be king is likely to be ongoing, with players overtaking each other within short periods.
Indian equipment for UMPPs
A committee headed by Planning Commission member Arun Maira, studying the proposal to make it mandatory for bidders of future ultra mega power projects (UMPPs) to buy only Indian equipment is likely to submit its report soon.
NTPC floats tender to source super-critical equipment
NTPC will float tenders worth Rs 17,000 crore this month-end for sourcing super-critical equipment.

