The Cabinet Committee on Economic Affairs (CCEA) on May 17th 2017 approved the Modified Coal Linkage Policy for the power sector. Under this policy, all power plants will be assured of adequate supply of coal at competitive prices
FlashNews:
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
SITA to Acquire Collins Aerospace Airport Solutions, Expanding Global Airport Technology Capabilities
RITES Dispatches First 18‑Coach Rake to Bangladesh Railway under Export Contract
AM/NS India Signs Pact to Upgrade Four ITIs in Andhra Pradesh under PM‑SETU
KONE Opens India’s First Digital Experience Centre in Pune to Drive Smart Building Innovation
NTPC Seeks Industrial Partners for 26% Equity in Co‑Generation Projects
India Businesses Advance AI, Digital Tools and Sustainability: Autodesk Report
Modi Opens India Mobile Congress, Says Nation Has Shifted from Consumer to Creator
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norway’s Ocean Sun to Pilot Membrane‑Based Floating Solar in India
New Relic Rolls Out Infrastructure 360 for Faster, Smarter AI Operations
Inox Green Completes ₹5.5 Billion Acquisition of Wind World’s 4.5 GW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes Tech‑Driven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
India’s Infrastructure Future Hinges on Making Projects Investable and Tech‑Driven: Deloitte Survey
FLY91 Expands Regional Network with Ceremonial Touchdown at Navi Mumbai International Airport
Brahmaputra Set to Reclaim Global Role as Dibrugarh Sends First Cargo to Bangladesh
IndiGo Raises Fares as ATF Costs Surge
Tag: Coal Linkage
Policy on auction of coal linkages in 2-3 months
Policy on auctioning of coal linkages to the power sector is likely to be finalised in 2-3 months, the government said. Proposed policy on auction of coal linkages to power sector will take two to three months,' Coal and Power Minister Piyush Goyal told reporters.
Power firms await coal linkage policy
Power producers have made a fresh appeal to the Centre to release a coal linkage policy soon. They have argued the coal linkage policy announced by the previous UPA government had covered 78,000 MW to be commercially operational by March 31, 2015.
Assured coal supply for stuck power plants
The order refers to the plants which are part of the tranche of projects totalling capacity of 78,000 Mw for which a presidential directive was issued in 2013.The central government will bail out close to 21,400 Mw of power plants by assuring coal linkage through new fuel supply agreements (FSAs).
Coal linkage for PPA developers
Given the litigation over the cap on fixed costs, the government would desist from auctioning more captive coal blocks to power companies
GVK gets green nod to import coal
GVK Power (Goindwal Sahib) Ltd, a subsidiary of GVK Power and Infrastructure, has got permission from the Environment Ministry to import coal from South Africa as a ´stop gap´ arrangement in case the company fails to get coal from its captive mines in Tokisud North sub-block in Jharkhand.

