Government expects to finalise the new policy for auction of oil and gas blocks during the ongoing financial year, Oil Minister Dharmendra Pradhan said.
FlashNews:
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalās 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Home » gas blocks
Tag: gas blocks
RIL says DGH responsible for delay in D-6 block progress
Reliance Industries (RIL) has blamed the Directorate General of Hydrocarbons (DGH) for the delay in developing gas blocks in KG-D6 in Andhra Pradesh. DGH has asked RIL to give up 6,601 sq km out of the total 7,645 sq km area in the block on the grounds that the time line to develop the fields had expired.

