For residents of MG Road, DLF Phase II and III in Gurgaon, the Rapid Metro will become a boon. It will also add sheen to the commercial properties in DLF Cyber City. Cushman and Wakefield says that since the start of construction of Rapid Metro in 2010, the residential properties on MG Road, DLF Phase II and III witnessed an appreciation between 35 per cent and over 100 per cent.
FlashNews:
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norway’s Ocean Sun to Pilot Membrane‑Based Floating Solar in India
New Relic Rolls Out Infrastructure 360 for Faster, Smarter AI Operations
Inox Green Completes ₹5.5 Billion Acquisition of Wind World’s 4.5 GW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes Tech‑Driven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
India’s Infrastructure Future Hinges on Making Projects Investable and Tech‑Driven: Deloitte Survey
FLY91 Expands Regional Network with Ceremonial Touchdown at Navi Mumbai International Airport
Brahmaputra Set to Reclaim Global Role as Dibrugarh Sends First Cargo to Bangladesh
IndiGo Raises Fares as ATF Costs Surge
India Becomes Veolia Foundation’s Regional Emergency Response Hub for Asia-Pacific
Airtel Business Unveils IQ Gateway to Secure Enterprise Messaging at Scale
POWERGRID Veteran Akhilesh Pathak Takes Charge as Director Projects
India Rolls Out $28 Billion GOBARdhan Biogas Plan to Cut Imports, Boost Rural Economy
India’s Civil Aviation Demand is Outpacing Supply: Kinjarapu Ram Mohan Naidu
INDIA’S INFRA STORY IS SHIFTING TRACKS
India’s Green Hydrogen Mission Chief Urges Industry to Back Emerging Ecosystem
Global Trust as Essential as Scale in Green Hydrogen: Pralhad Joshi
Tag: MG Road
Re-carpeting of MG Road in Gurgaon to end in 6 months
The Haryana Public Works Department (PWD) has stated that the re-carpeting and re-construction of MG Road in Gurgaon will be completed within six months. The heavy vehicular traffic on the stretch was delaying the work, PWD authorities said. The work was taken up last month when Gurgaon and Delhi surburbs were witnessing heavy rains.
Blore road work needs multi-agencies’ coordination
In Bangalore, the much-awaited upgrade of roads along the Namma Metro stretch from Anil Kumble Circle on MG Road to Baiyappanahalli could take place very soon. The project cost is estimated at Rs 114 crore. For this, multi-agencies coordinated effort is said to be essential in addition to the Bangalore Metro Rail Corporation (BMRCL). The upgrade involves a complete overhaul of the roads and underground utilities, installation of permanent UG ducts for storm water, electric cables, sewage, OFCs,
DMRC to work on Kochi’s MG Road for metro rail
In Kochi, the Delhi Metro Rail Corporation (DMRC) has finalised plans to begin work on the city's heart line, MG Road, starting next weekend (June 29-30). While work is expected to start in the right earnest only after the Onam festival, the Metro agency will carry out the preparatory work during weekends till September on the stretch.
DMRC has sought the permission to close down the stretch on MG Road between Padma Junction and Abad Plaza hotel on June 29-30 to physically trace utility lines.
Elevated corridor on Gurgaon’s MG Road set to get nod
The Gurgaon Municipal CorporationÂ’s proposed elevated corridor at Maharana Pratap Chowk, MG Road in the city is likely to get government's approval in a weekÂ’s time. The move is expected after a high level meeting in Chandigarh, recently. The MCG had sent a detailed project report (DPR) for the government's approval three months ago that met some objections from the top brass.

