According to industry sources, the cost of electricity would be less than Rs 6 a kWh if the price of imported natural gas is pooled with that of the domestic one. Further, gas price pooling would enable power companies to run their units at 50 per cent plant load factor, sources informed. Sources feel that the gas price pooling mechanism for power sector, if implemented, would result in a price of les
FlashNews:
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalās 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Japanās JFE Engineering Invests Ā„750 Million in Antony Waste; First FDI in Indiaās Waste-to-Energy Sector
SDHI Wins Indiaās First Ammonia DualāFuel Bulk Carrier Order
SAME and IndiGo Launch Cadet AME Programme to Train Indiaās Next Aviation Engineers
IndiGo Revises Fuel Charges as ATF Costs Soar
Home » plant load factor
Tag: plant load factor
Will privatisation work?
Lack of institutional capacity for developing coal blocks, limited availability of sound contract miners, and procedural challenges faced by the captive coal block owners are major issues haunting the coal mining in India. Dealing with these challenges is important for improving sector supplies, rather than privatisation, writes Dilip Kumar Jena.

