Hitachi and its subsidiary company, Ansaldo, are engaged with the Indian Railways on many platforms. We will be introducing state-of-the-art technology in signalling and telecommunications on the Dedicated Freight Corridor (DFC) from Delhi to Mumbai.
FlashNews:
Vikram Solar Rolls Out First Module at Tamil Nadu Mega‑Facility
AI‑Driven Governance for Capital Projects
India Needs a Comprehensive Approach to Data Sovereignty and Resilience: AS Kiran Kumar
Why India’s Logistics Costs Will Not Fall Through Infrastructure Alone
PM Modi to Dedicate HPCL Rajasthan Refinery, India’s First Greenfield Integrated Complex
Mumbai Port Unveils ₹50.29 Billion Projects on 154th Foundation Day
RVNL Completes Sitafalmandi-Lallaguda Chord Line, Boosting Hyderabad Rail Connectivity
Tata Power Commissions 100.8 MW Jewali Wind Project in Maharashtra
Skyroot Sets Launch Window for India’s First Private Orbital Rocket
India’s ACME Group Seals Landmark Green Ammonia, Methanol Deals with Japan
Indian Railways Posts 4% Freight Growth in June 2026
India, Japan Join Hands to Build Energy Resilience
Adar Poonawalla Family Office Invests ₹700 Crore in Inox Clean Energy
India-EU Set to Deepen Cooperation on Sustainable Ship Recycling
Saleem Ahmad Takes Additional Charge as CMD of IRCON, Strengthening Synergy with RVNL
India’s WABAG Secures Vienna Order for Donauinsel Water Works Expansion
Tech Cuts Mishandled Bag Rates by 23%, But $6.3 Billion Cost Persists: SITA
SK Sinha Appointed Director Finance at GAIL, Bringing Three Decades of Expertise
NHAI to Empanel IITs for Independent Proof Checking of Bridge Designs
Tag: RDSO
Railways on Overdrive
While all the pressure to build a railway network in India in the mid-nineteenth century came from London, it is well into the 21st century that pressures of a very different kind are at work in modern-day India.
We have constructed almost half of all the new lines that were laid last year
There are basically two kinds of projects. One is the greenfield projects where we are going to construct an absolutely new line. The other type is where we construct along the existing track, the doubling or third or fourth lines.
Hyderabad Metro gets ´speed certificate´
Hyderabad Metro Rail project got its first interim clearance for running trains between Nagole and Mettuguda.
We enable reduction in industry input costs
Pradeep Kumar Kharola, MD, Bangalore Metro Rail Corporation Ltd (BMRCL), tells Shashidhar Nanjundaiah that efficiency-of commute and technology-is the key mantra for the city's metro rail system, another "reach" of which will be operational soon.
Railways to switch over to LNG
Indian Railways' Research Design & Standard Organisation (RDSO) is developing locomotive prototype which will run on LNG
Jaipur metro project
The Railway Ministry gave technical clearance for the operations in signal, telecom and electricity expansion system at the Jaipur Metro Rail Project.
Rlys to rope in contractor for LNG locomotive project
In an attempt to reduce the operating cost of locomotives, Indian Railways plans to set up a locomotive prototype equipped with a single gas turbine operating on LNG. For this purpose, the Research Design and Standards Organisation (RDSO), which is the research arm of Indian Railways, sought application from interested contractors who could develop such a locomotive





