Visakhapatnam Port Trust (VPT) may find it difficult to achieve its planned capacity increase to 150 million tonne by 2020 as several port projects are facing delay.
FlashNews:
Bhutan, World Bank Seal $515 Million Pact for Dorjilung Hydropower
REC Posts Record ā¹162.8 Billion Profit, Declares Highest Dividend
Indiaās Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
Tag: Visakhapatnam Port Trust
Transport of coal via road may cause pollution
Citing adverse effect from pollution, TDP leader and former minister Bandaru Satyanarayana Murthy opposed any move to transporting coal by road from the general cargo berth in Visakhapatnam Port. At a press conference, Murthy opposed the transportation of coal by road stating it would bring back the pollution
VPT faces delay in implementing key projects
Visakhapatnam Port Trust (VPT) may find it difficult to achieve its planned capacity increase to 150 million tonne by 2020 as several port projects are facing delay. The company planned to achieve this capacity expansion through an estimated investment of Rs 14,000 crore. The port authority is facing implementation delay for thre
Vizag port may invite fresh bids for Rs 6 bn project
Visakhapatnam Port Trust (VPT) would reportedly invite fresh price bids for the Rs 633-crore contract to extend the existing container terminal from 450 metre to 850 metre. The port had earlier invited the bids to extend the container terminal and add capacity of 0.54 million TEUs in addition to the existing 0.40 million TEUs. Currently, Visakhapatnam Container Terminal (VCTPL) is handling 247,133 TEUs per annum against the capacity of 4 lakh TEUs
Consultant for Bheemili port
Visakhapatnam Port Trust (VPT) plans to rope in a Delhi-based consultant firm, Aecom, for preparing a detailed feasibility report (DFR) for the proposed satellite port at Bheemili.
VPT to rope in consultant for Bheemili port project
Visakhapatnam Port Trust (VPT) plans to rope in a Delhi-based consultant firm, Aecom, for preparing a detailed feasibility report (DFR) for the proposed satellite port at Bheemili. In 6 months time, the consultant firm may submit its report after studying topographical, hydrological and other relevant aspects like projected traffic after two decades
Vizag port seeks Rites’ suggestion for Rs 6.3 bn project
Visakhapatnam Port Trust (VPT) mandated Rites to study the revenue sharing model for the proposed Rs 634-crore second container berth project at the port. VPT roped in Rites to suggest a revenue sharing model because it is not satisfied with the revenue share offered by Visakha Container Terminal Private Limited (VCT
Mechanisation at Vizag port
The mechanisation of cargo handling facilities in the Visakhapatnam Port Trust (VPT) would increase the cargo handling capacity of the port by additional 50 million tonne per annum,
Vizag Port takes up mechanisation at Rs 444.1 cr
Residents of Visakhapatnam's old areas like Kotha Veedhi and other areas in the locality will be relieved from dust pollution if the proposed mechanisation programme at Visakhapatnam Port Trust (VPT) goes as per the plan. The VPT has lined up a series of coal mechanisation programmes involving crores of rupees.
Mechanisation to raise capacity at Vizag port
The mechanisation of cargo handling facilities in the Visakhapatnam Port Trust (VPT) would increase the cargo handling capacity of the port by additional 50 million tonne per annum, Ajeya Kallam, Chairman of the port informed reporters. The port recently commissioned the Rs 444.1 crore mechanised coal handling facility of Vedanta Resources at VPT. Following this, the outer harbour would be totally clean and prevent vehicular movement which spreads coal parti

