One of the thermal units at Mettur generating 600 MW has been shutdown as the coal scheduled to arrive from West Bengal and Odisha has been delayed due to the floods in the mines. Currently, the plan is to manage it with wind power and open market purchase as stopping a unit is just a precautionary measure, informs Vikram Kapur, Chairman, Tangedco. Six ships were waiting at Paradip port to evacuate coal from the mines in Odisha but were unable to move due to heavy rain. Tangedco used to get nearly 40,000 tonne of coal per day by rail but recently, only 12,000 tonne per day has been coming into the state. With a combined capacity of 1,440 MW, Mettur has five power generation units, of them four units are of 210 MW capacity each and one is of 600 MW.
FlashNews:
India’s Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ₹90 Billion Growth for FY2026‑27
Star Air Launches 70 Weekly Flights, Introduces First‑Ever Direct Mundra-Delhi NCR Route
India’s Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
“RVNL Delivers 17,000 km Rail Projects, Executes ₹2 Trillion Infrastructure:” Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puri’s Doha Visit
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
Home » Coal shortage at MetturÂ’s 600 MW unit
Coal shortage at MetturÂ’s 600 MW unit
Coal & Mining
November 1, 2018June 9, 2021


Leave a Reply
You must be logged in to post a comment.