State-run power generator NTPC is awaiting forest department clearance to set up its first wind energy project in the country. The 100-MW project, with an estimated cost of Rs 650 crore is to come up at Guledagudda in Bagalkot district, Karnataka. Of the Rs 15,166-crore investment proposed in the first stage, NTPC has spent Rs 5,900 crore till September.
FlashNews:
Sovereign Cloud Emerges as Indiaâs AIâReady Digital Foundation
Shivalaya Construction Secures ERESâ47 Transmission SPV for Eastern Grid Expansion from RECPDCL
Indiaâs Open Mobility Pioneer Takes Its RideâHailing Model to Europe
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
SITA to Acquire Collins Aerospace Airport Solutions, Expanding Global Airport Technology Capabilities
RITES Dispatches First 18âCoach Rake to Bangladesh Railway under Export Contract
AM/NS India Signs Pact to Upgrade Four ITIs in Andhra Pradesh under PMâSETU
KONE Opens Indiaâs First Digital Experience Centre in Pune to Drive Smart Building Innovation
NTPC Seeks Industrial Partners for 26% Equity in CoâGeneration Projects
India Businesses Advance AI, Digital Tools and Sustainability: Autodesk Report
Modi Opens India Mobile Congress, Says Nation Has Shifted from Consumer to Creator
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norwayâs Ocean Sun to Pilot MembraneâBased Floating Solar in India
New Relic Rolls Out InfrastructureâŊ360 for Faster, Smarter AI Operations
Inox Green Completes âđ5.5âŊBillion Acquisition of Wind Worldâs 4.5âŊGW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes TechâDriven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
Home » NTPC to add 4,500 MW in South
NTPC to add 4,500 MW in South
Power & New and Renewable Energy
November 1, 2014November 1, 2014


Leave a Reply
You must be logged in to post a comment.