With 50 per cent completion in terms of civil and electrical work, almost 800 km of dedicated rail freight corridor is set to open in the current financial year while the remaining 1,500 km will be commissioned next year.
FlashNews:
India’s Chip Ambitions Get a Boost as TCE and ASU Launch Semiconductor Talent Programme
Indus Towers Eyes Africa Expansion with Airtel-Led Push into Nigeria, Uganda and Zambia
Delhi Airport Becomes Asia’s Fastest-Growing Transit Hub After 244% Surge in International Transfers
Waaree-Backed Solfin Partners with Japanese NBFC to Expand Solar Financing Across India
ISRO Begins SSLV Launch Pad Construction at Thoothukudi Spaceport
Beyond Russia: ONGC’s Strategic Push for Global Oil & Gas Assets
GAIL’s Record FY2025 Performance Sets Stage for LNG, Biogas, Digitalisation and Ship Leasing Expansion
NHAI Subsidiary to Roll Out India’s First Multi-Lane Free Flow Tolling System in Gujarat
India Plans Airport-Centric Real Estate Push; Naidu Targets 15% Economic Growth
NALCO’s Lithium Leap: Head Reveals Timeline for Argentina Mines, Global Expansion Plans
Mumbai-Ahmedabad Bullet Train Gains Momentum with Major Civil Works Milestones
ONGC Begins Gas Sales from Chinnewala Tibba Block, Boosting Rajasthan’s Energy Grid
OIL-BPCL Join Hands for City Gas Network Rollout in Arunachal Pradesh
Government push makes India’s maritime sector future-ready, unlocking $1 trillion potential”: Sonowal
ISRO Innovations Continue to Reach Industry as IN-SPACe Signs Five New Deals
India Launches Maritime Hackathon at IIT-Madras to Power Port-Tech Startups Ahead of Maritime Week 2025
CAE, InterGlobe JV Opens Fourth Commercial Aviation Training Centre in India to Meet the Country’s Soaring Pilot Demand
India’s Space Vision 2040: Jitendra Singh Says Astronaut Will Announce ‘Viksit Bharat’ from Moon
India May Launch Dedicated Maritime Satellite to Boost Coastal Governance: Sonowal
Tag: civil
Ducon secures pet coke pipe conveyor order from Indian Oil
Ducon Technologies (I) Pvt Ltd has announced that the company has secured a prestigious pet coke pipe conveyor contract from Indian Oil Corporation Ltd, for its Guwahati Refinery, through a national competitive bidding process.
Richa Ind wins Bharat Electronics, MoD order
Construction and engineering firm Richa Industries has got an order from Bharat Electronics Limited (BEL) for constructing a pre-engineered building to be used for assembling masts and composite structures.
Design consultant for Central Square soon
The Chennai Metro Rail will soon appoint a design consultant specially for developing the largest underground station in Chennai, the Central Square.
WATER DIVISION – Rs 233.09 crore
Civil, Structural and Architectural works etc., of complete Raw Water reservoir intake Water Pump house, Desilting chamber, Civil work for piping from intake water pump house to Raw water Pump house, Gas Chlorination Plant, Raw water Pump house, Road to intake Pump house, Boundary wall (part), Road
Global firms to bid for Mopa airport
Global infrastructure companies such as Germany´s Hochtief Aktiengesellschaft, French firm Vinci Construction, South Korea´s Incheon International Airport
Enhancing air connectivity
The 4th International Exhibition & Conference on Civil Aviation, 'India Aviation 2014' discussed the huge untapped potential in the Indian aviation sector.
Complaint against ONGC rejected by CCI
A complaint filed by an Assam-based civil and transport contractor alleging anti-competitive practices by Oil and Natural Gas Corporation of India (ONGC) was rejected by the Competition Commission of India (CCI). The CCI, in its order, said the complainant did not submit any evidence of bid rigging with respect to tenders floated by ONGC for hiring hydraulic cranes. The complaint pertains to ONGC notice, issued in December 2012, inviting bids under two bids system from
Phase II of Hambantota Port project seen in 2014
The second phase of the construction of the Port of Hambantota, situated about 19 nautical miles north of the key shipping route between the Malacca Strait and the Suez Canal, is expected to be operational in 2014. The dredging for the second phase was slightly dela