The work on pipelaying for transporting liquified natural gas (LNG) of Gas Authority of India (GAIL) is delayed due to FACT unable to give permission to undertake construction work at Udyogamandal and Cochin division.
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Spanish firms in UP project
Two Spanish firms, Isolux Corsan and Cobra Instalaciones, have entered the fray for the proposed PPP project in power transmission in Uttar Pradesh.
65,000 MW in 12th plan
India is slated to add 65,000 MW of power during the 12th Five Year Plan as various power projects will be commissioned by then.
RBI: 2G loans in line with norms
The Reserve Bank of India (RBI) today exuded confidence that loans given to 2G spectrum licence holders would not turn into bad debts on account of the scam in allocation of radiowaves.
Signal free 291 km Panipat-Jalandhar highway
The six-lane National Highway-1 from Panipat to Jalandhar, 291 km stretch will be completely signal-free by November 2011.
CIL and Visakhapatnam Port to build berth
Coal India plans to form a partnership with the Port of Visakhapatnam on the east coast to increase import capacity as power generation demand rises.
Mundra Port commences coal terminal operations
Mundra Port and SEZ (MPSEZL) has commenced operation at its coal handling terminal and is all set to double its capacity to make it the world’s largest coal receiving terminal.
NTPC floats tender to source super-critical equipment
NTPC will float tenders worth Rs 17,000 crore this month-end for sourcing super-critical equipment.
L&T bags Chennai Metro Rail depot works
The Chennai Metro Rail has awarded the construction of depot works to Larsen and Toubro at a cost of Rs 198.10 crores.
Bina Refinery project to be operational this month
The ambitious Bina Project of Bharat-Oman Refinery is all set to go into commercial production from January 2011.

