Over Mrinal Gore flyover in Goregaon East, the Mumbai Metropolitan Region Development Authority (MMRDA) launched the girder of the Dahisar East- Andheri East metro line in two phases over August 19 and 20.
FlashNews:
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaâs Smart Meter Rollout
Delhi Airport Unveils MultiâLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over âč90âŻBillion Growth for FY2026â27
StarâŻAir Launches 70âŻWeekly Flights, Introduces FirstâEver Direct Mundra-DelhiâŻNCR Route
Indiaâs Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
âRVNL Delivers 17,000 km Rail Projects, Executes âč2 Trillion Infrastructure:â Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriâs Doha Visit
IRB Group Reports âč8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuâII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaâs First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalâs 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Author: admin (Infratructure Today)
Auction of eight highways to fetch Rs 54 billion
Nearly Rs 54 billion will be generated through the auction off the second tranche of eight completed national highway projects. The Toll Operate Transfer (TOT) will be responsible for the maintenance and will have the right to collect the toll on these stretches for 30 years.
IndiaĂâs first ISTS connected wind power project commissioned
Solar Energy Corporation of India (SECI) conducted IndiaĂâs first auction of wind power projects in February 2017 of Rs 3.46 tariff in accordance to the governmentĂâs plan of 175 GW RE within 2022.
EESL to supply smart electricity meters for 1.8 million consumers in Bihar
In order to deploy smart electricity metres in 130 towns and adjacent rural areas covering 1.8 million consumers in the state, Energy Efficiency Services (EESL) has signed a Memorandum of Understanding (MoU) with North Bihar Power Distribution (NBPDCL) and South Bihar Power Distribution (SBPDCL).
Punjab may fire up units at Ropar plant
With the demand for power rising up to 12,500 MW, the Punjab Government has decided to restart the operations at two thermal units of Ropar power plant.
Andhra Pradesh emerges front runner in energy efficiency steps
On account of its outstanding performance in the energy sector, Andhra Pradesh has emerged as the front runner state at the national level in the field of energy efficiency as per the State Energy Efficiency Preparedness Index released by Bureau of Energy Efficiency (BEE) and NITI Aayog
Chandigarh residents to pay more for power for three months
The UT electricity department has proposed to increase the Fuel and Power Purchase Cost Adjustment (FPPCA) charges up to 10 per cent on the existing tariff, leading the Chandigarh residents to pay more for power for three months
Tata Power joins race for Equis hydropower projects in Sikkim
Tata Power have shown interest in buying two hydroelectric power projects in Sikkim that are owned by Equis Energy. The Asian infrastructure investor company operates and owns 220 MW of hydro assets in Sikkim through a platform called Hydreq.
Tata Power gets shareholdersĂâ nod to raise Rs 55 billion
Through a special resolution that was passed by the requisite majority at the annual general meeting, Tata Power has sought shareholdersĂâ approval to raise up to Rs 55 billion through issuance of non-convertible debentures on private placement basis.
GUVNL invites bids to procure 1,000 MW power on short-term basis
In order to procure 1,000 MW power on short-term basis, the state-run Gujarat Urja Vikas Nigam (GUVNL) has invited bids through tariff based competitive bidding.

