Home » Roads & Highways » Page 164

Category: Roads & Highways

Post
HC asks Thane TMC to complete road projects

HC asks Thane TMC to complete road projects

The Bombay High Court has chided the Thane Municipal Corporation (TMC)recently for not undertaking road projects approved in the city development plan. The PIL came up for hearing before a division bench of Justices Ajay Khanvikar and AP Bhangle who then directed the TMC to take up the issue with the departments concerned and resolve it within two weeks.

Post
MMRDA takes up road works on big scale in suburbs

MMRDA takes up road works on big scale in suburbs

The Rs 4,028-crore budget cleared by the Mumbai Metropolitan Region Development Authority (MMRDA) on March 23 made it clear that the budget's thrust would be on road infrastructure development in the city's distant suburbs such as Thane, Navi Mumbai, and Kalyan-Dombivli.

Post
Manholes covered Nagpur roads now give smooth ride

Manholes covered Nagpur roads now give smooth ride

To made rides on Nagpur roads less bumpy, the the Nagpur Municipal Corporation (NMC) has started leveling manholes with the road surface, starting from LaxmiNagar zone in South-West Nagpur. In another development, the work to shift electricity poles on 27 roads is almost nearing completion.

Post
IL&FS gets Rs 1,348.20 cr NHAI project in Maha

IL&FS gets Rs 1,348.20 cr NHAI project in Maha

The National Highways Authority of India's (NHAI) project of four-laning of Khed-Sinnar Section of NH-50 has been bagged by the IL&FS Transportation Networks. The stretch is in Maharashtra. The project work is from Km 42.000 to Km 177.000 (Design Length - 137.946 km) under the Phase IV B in Maharashtra on DBFOT basis.

Post
IDA’s plea to State govt to reconsider LIG link road width

IDA’s plea to State govt to reconsider LIG link road width

Unable to get sufficient land and remove encroachments coming in the way of proposed LIG link road, Indore Development Authority (IDA) has once again sent a request to the Madhya Pradesh government for reconsidering to keep width of road to 18 metre against 24 metre as proposed in the master plan.

Post
GMR ready to re-take road project if govt cuts premium

GMR ready to re-take road project if govt cuts premium

GMR Infrastructure now says that it is ready to take up the 555-km Kishangarh-Udaipur-Ahmedabad highway project again if there is a cut in the initial premium it owes to the government. GMR had withdrawn from the Rs 5,700 crore highway project owing to inconsistencies on environment clearance.

Post
Toll rates hiked on Ernakulam-Thrissur national h’way

Toll rates hiked on Ernakulam-Thrissur national h’way

In Kerala, the Guruvayur Infrastructure, a joint venture company responsible for toll collection and road maintenance on the Mannuthi-Edappally stretch of the National Highway has hiked the toll rates being charged from motorists at the Paliyekkara toll plaza in Thrissur on March 27. The toll hike has taken place despite strong public protests.

Post
Now, Delhi to have one-legged elevated roads

Now, Delhi to have one-legged elevated roads

In a first, 24.2 metre-wide elevated roads will be constructed in Delhi on a single narrow column using the single-pier technique. In this, six lanes of traffic will move on top, while four lanes will be open at the ground level as well. These elevated flyways are being built on outer Ring Road and Ring Road, and will help avoid traffic congestion at the ground level, say officials.

Post
Bangalore’s Bannerghatta road to be widened soon

Bangalore’s Bannerghatta road to be widened soon

The iconic stone structure at the main entrance of Indian Institute of Management Bangalore (IIM-B) will soon make way for a road widening project on Bannerghatta Road. The widening of the Bannerghatta-NICE Road stretch has been approved by the Bruhat Bengaluru Mahanagar Palike (BBMP) recently.

Post
MMRDA to spend Rs 622 cr on road infra in Thane dist

MMRDA to spend Rs 622 cr on road infra in Thane dist

Mumbai Metropolitan Region Development Authority (MMRDA) will spend Rs 622 crore on the extended Mumbai urban infrastructure projects, mainly in Thane district. It will build six flyovers, a creek-bridge at Vasai between Naigaon and Bhayendar and over 90-km of road network in Vasai, Thane, Kalyan, Dombivli, Ambernath, Karjat , Badlapur and Arnala.