Reeling under severe shortage of power until a few months ago, Karnataka is all of a sudden left with the bounty of surplus power. The surplus generation has left the energy department in a dilemma of whether to make arrangements for purchase of power to cope with the summer crisis or manage with its own. Power generation in the state was augmented after Karnataka Power Corporation Limited (KPCL) successfully commissioned the third unit of the Ballari Thermal Power Plant (BTPS) at Kuditini. It can generate 700 MW of power, and has been billed as the only generating unit owned by the state with such a huge capacity. Karnataka Energy Minister said that the unit was a major milestone.
FlashNews:
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Japan’s JFE Engineering Invests ¥750 Million in Antony Waste; First FDI in India’s Waste-to-Energy Sector
SDHI Wins India’s First Ammonia Dual‑Fuel Bulk Carrier Order
SAME and IndiGo Launch Cadet AME Programme to Train India’s Next Aviation Engineers
IndiGo Revises Fuel Charges as ATF Costs Soar
Putting Turbulence Behind IndiGo Appoints Willie Walsh to Drive Future Global Growth
DFCCIL Completes Trial Run on Newly Electrified JNPA-Vaitarna Freight Corridor
Cleared for Take Off!
Neworld Developers: Leading the Charge in Real Estate
REC Presents Live Demos of P2P Energy Trading Pilot at New Delhi’s Global AI Impact Summit
Fuel in Transition
Facility Management: Beyond Build
We want to take the best construction to the people
Powering the New Industrial Ecosystem
Home » After acute shortages, Karnataka electrified with surplus power
After acute shortages, Karnataka electrified with surplus power
Power & New and Renewable Energy
October 1, 2016October 1, 2016


Leave a Reply
You must be logged in to post a comment.