The Bharatmala network designed on the shortest possible route connecting the origin and destination, though a well thought through and definitely a step in the right direction, is bound to impact the existing network by directly competing with a few stretches including some of the existing BOT (Toll) road projects.
FlashNews:
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ₹90 Billion Growth for FY2026‑27
Star Air Launches 70 Weekly Flights, Introduces First‑Ever Direct Mundra-Delhi NCR Route
India’s Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
“RVNL Delivers 17,000 km Rail Projects, Executes ₹2 Trillion Infrastructure:” Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puri’s Doha Visit
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Author: admin (Infratructure Today)
Exicom installs AC and DC electric vehicle charging station
Exicom installed AC & DC electric vehicle charging station at Ministry of Power office in Shram Shakti Bhawan, New Delhi. It is part of the plan to develop EV charging points across the country.
Delta Electronics launches EV solutions
Delta Electronics India has launched its complete range of energy efficient electric vehicle (EV) charging solutions in India.
Tata Communications gives lift security to next level with IoT
Tata Communications is working with Surbana Jurong, one of AsiaÂ’s largest urban, industrial and infrastructure consulting firms, to equip its Internet of Things (IoT)-enabled lifts and escalators with secure, scalable connectivity to MicrosoftÂ’s Azure cloud platform.
Hindustan Infralog headed for new acquisition
Hindustan Infralog Private Limited(HIPL) has announced the acquisition of a 90-per cent stake in Continental Warehousing Corporation (Nhava Seva)(CWCNSL), an integrated multimodal logistics player in India.
Bentley offers cloud services
Bentley Systems has announced the early access of BentleyÂ’s Design Insights cloud service, a new extension of BentleyÂ’s Scenario Services.
The Big Infra Opportunity
Stakeholders harp on the government's infrastructure push and expect construction orders of Rs.18 trillion in the next six years. This order inflow volume should support 12 to 15 per cent of industry-level execution of compound annual growth rate (CAGR).
Powerful moves ahead!
Infrastructure Today has completed yet another milestone with over 14 years of coverage on a sector which can make or break the India development story.
Private investment will fructify with structural changes
Our outperformance is the result of the amalgamation of high product quality, high-intensive technology, strategic flexibility and organisational responsiveness. In uncertain times there are sudden shifts in demands, making it necessary for product-cum-service providers like us to respond to the changing design and testing compliances with increasing speeds.
Sizeable Opportunities
The overall cost of expansion of the operational and approved metro projects under implementation is over Rs 2.5 lakh crore, and another Rs 2 lakh crore worth projects are in various stages of approval and are likely to come up for bidding in the next five years





