A 300-MW hydroelectric power project in Uttarakhand received environmental clearance from the Ministry of Environment and Forests (MoEF). The project is located in the Upper Yamuna River Basin in Dehradun district. It will produce 612.93 million units of electricity every year. The project will also provide drinking water, water for irrigation, and water for industrial use.
FlashNews:
DHL Group Expands New Energy Logistics Amid Global Supply Shifts
INâSPACe Funds Three Startups to Propel Indigenous Space Innovation
AM/NS India, IIT Roorkee Forge Strategic Pact for Manufacturing Innovation
Second Heavy Haul Seminar 2026 Charts Future of Rail Freight
Delhi Airport Transfer Traffic Hits 27%, Reinforces Hub Status
CleanMax-GACL Seal Gujaratâs Largest Hybrid RE Partnership for Industrial Decarbonisation
Atlanta Electricals Wins âš2.85 Billion PSTCL Transformer Order
ULCCS Model Gains Global Spotlight at UN Symposium
India Clears âš100 Billion ATF Stabilisation Package Amid West Asia Crisis
Chasing 70 GW Ambition, Suzlon 2.0 Reâinvents Wind for Energy Transition
Digi Yatra Crosses 100 Million Journeys, Expands Seamless Travel Across 38 Airports
AM/NS India Wins First PMâSETU Approval, as Andhra Pradesh Leads ITI Transformation
NHAI Finalises Highway Monetisation Plan for FY2026â27
Sonowal Launches Port Performance Index, Digital Maritime Reforms to Boost Competitiveness
MGL and Fourth Partner Energy Ink MoU for Clean Energy Push
IGIA Deploys SKYCAST, Indiaâs First NextâGen AllâWeather Station to Boost Aviation Safety
REC Signs MoU with ERDA to Strengthen Quality Assurance under RDSS
SEIL Energy India Hosts South Indiaâs First C&I Conference
AM/NS India Sets Global Benchmark with UltraâHigh Strength Welded Pipes
Author: admin (Infratructure Today)
L and T power plant operational
Larsen and Toubro (L and T) has begun commercial operations of its first 700 MW unit of the 1,400 MW supercritical thermal power plant at Rajpura in Punjab. The plant was constructed on a turnkey basis by L and T Power, with more than 90 per cent of the equipment sourced from group companies of L and T. The supercritical boiler and turbine were manufactured by L and TĂ´s joint venture companies with Mitsubishi Heavy Industries (MHI).
JSPL acquires Kineta Power
Jindal Steel and Power (JSPL) has acquired 100 per cent stake in Kineta Power, a 1,980 MW privately-owned coal-based power plant in Nellore district of Andhra Pradesh. The deal would be executed in phases and the project cost would be around Rs 10,000 crore. JSPL has plans to run the plant on imported coal from its mines in Indonesia and would blend it with the thermal coal produced at its mines in Mozambique.
Jaypee Group to sell power assets
Jaypee Group is planning to selling a majority stake in two of its hydro-electric power plants in north India for about $1 billion, according to reports. The group had expanded aggressively into power production and construction during the boom in the Indian economy post 2006. However, the global financial downturn in 2008 and a slowdown in economy has hurt its expansion plans.
TUV SUD to help modernise power plants
TUV SUD, the global testing, certification, inspection and training provider will contribute to the modernisation and efficiency improvement roadmap for Indian power plants. The company would also support power plant owners in India in modernising their installations. The Central Electricity Authority (CEA) has empanelled the international provider of testing and certification services as a renovation and modernisation (R&M) consultant for thermal power plants.
Hindustan Power embarks on major investment plan
Hindustan Power Projects, formerly known as Moser Baer Projects, is embarking on Rs 32,000-crore investment plan to have 5,300 MW of capacities in its portfolio in the next three years. The Delhi-based company has already made an investment of around Rs14,500 crore across its projects in solar, coal-thermal and hydro power, according to the company. ?
Lanco sells hydro power assets
Lanco Infratech has struck a deal with the UKĂ´s renewable energy firm Greenko to sell three hydro power assets with a combined capacity of 80 MW. Lanco Hydro Power has agreed to sell off its entire holding in 70 MW Lanco Budhil Hydro Power Project in Himachal Pradesh to Tejassarnika Hydro Energies, a subsidiary and Indian arm of Greenko. Lanco has agreed to divest two small hydro power plants of 5 MW each located in Himachal Pradesh.
Work on new power corridor begins
The UP Power Transmission Corporation (UPPTCL) has initiated a project of laying a new electricity corridor between Mainpuri and Greater Noida. The corridor would be around 400 km long and connect to the under-construction 765 kV substation in Yamuna Expressway area. The transmission corridor will be laid in a PPP mode by UPPTCL along with two private companies.
NALCO commissions 2nd wind power project
National Aluminium Company (NALCO) has set up its second wind power plant at Ludarva in Jaisalmer district of Rajasthan with a capacity of 47.6 MW. This Rs 283 crore project was executed through Gamesa Wind Turbines, which involved erection of 56 wind turbines, each of 850 kW rating. In the first phase of commissioning, 36 turbines were erected. Now, in the second phase, the remaining 20 turbines have been successfully commissioned.
bridge maintenance policy
The Bihar Road Construction Department (RCD) is planning to have a bridge maintenance policy on the lines of road maintenance policy. The RCD has constructed 19,000 km of roads and over 12,000 bridges and culverts since 2006. The government is now focusing on the maintenance of these roads and bridges because there has been no such policy so far.

