Category: Power & New and Renewable Energy

Post
Wind energy capacity declines

Wind energy capacity declines

Minister of New and Renewable Energy Dr Farooq Abdullah said that the capacity addition in the wind energy sector declined after the withdrawal of Accelerated Depreciation (AD) and Generation Based Incentive (GBI) from April 2012. In the approved 12th Plan document

Post
Assam to set up ring fence system

Assam to set up ring fence system

To detect power thefts in the state, the Assam government is to introduce 'Ring Fence System,' an advanced IT device system. With this, electricity theft might soon become a thing of past in Assam, says the State Power Minister Pradyut Bordoloi.

Post
Ujaas bags roof top solar contract

Ujaas bags roof top solar contract

Ujaas Energy has made an entry into their Mysite business vertical in a big way where Ujaas provide turnkey services to their clients on their sites majorly for the bigger roof top installations. In the recent bid from Solar Energy Corporation of India (SECI)

Post
Govt awards Rs 13,185 cr transmission projects to pvt cos

Govt awards Rs 13,185 cr transmission projects to pvt cos

The Union Minister of State for Power Jyotiraditya M. Scindia has stated that the power transmission sector was opened up for private sector participation through mandatory competitive bidding with certain exemptions as per Tariff Policy notified by Government of India on January 6 in 2006 and the Gazette notification on July 8 July in 2011.

Post
Govt may pace up clearances to Rs 49K cr power plants

Govt may pace up clearances to Rs 49K cr power plants

The Prime Minister Manmohan Singh headed Cabinet Committee on Investments is expected to speed up Rs 49,000 crore worth power plants of companies like Reliance Power and Essar Power, which have been stuck for want of environment and forest clearances at various levels. The panel will consider diversion of forest land for a coal block attached to Rs 20,852 crore Sasan ultra mega power project.

Post
Power sector to get additional gas till 2015-16

Power sector to get additional gas till 2015-16

The Union Power Minister Jyotiraditya Scindia stated that from 2013-14 until 2015-16, all additional gas would be given to the power sector. The gas offered to fertiliser needs to be supplied, beyond that any additional gas would be given to power sector, Scindia said. An empowered group of ministers (EGoM) headed by Defence Minister AK Antony decided this on August 24.

Post
Uttarakhand govt to bring in new power policy

Uttarakhand govt to bring in new power policy

Uttarakhand government would shortly formulate special policies for the development of new hydel projects and other reconstruction works in view of the June 16-17 floods. For this purpose, the government would set up a core group to formulate the new policy involving top environmentalists like Anil Joshi, the head of HESCO and The Energy and Resources Institute Director-General RK Pachauri, said the State Chief Minister Vijay Bahuguna.