Home » Roads & Highways » Page 102

Category: Roads & Highways

Post
Govt may amend toll policy soon

Govt may amend toll policy soon

The Union government is likely to take a decision on the practice of toll collection by road developers in the country. The Highways Ministry has suggested to the Union Cabinet to end the toll collection by road developers once the road project of the particular developer comes to an end. The idea is to ensure that developers expedite projects' completion rather than delay construction and keep on collecting toll.

Post
Govt may amend toll policy soon

Govt may amend toll policy soon

The Union government is likely to take a decision on the practice of toll collection by road developers in the country. The Highways Ministry has suggested to the Union Cabinet to end the toll collection by road developers once the road project of the particular developer comes to an end. The idea is to ensure that developers expedite projects' completion rather than delay construction and keep on collecting toll.

Post
AP govt gives nod to Rs 200 cr road tunnel project

AP govt gives nod to Rs 200 cr road tunnel project

A road tunnel of 1.6 km length is to be built under the Simhachalam hills in coastal Andhra Pradesh at a cost of Rs 200 crore under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) Plus scheme. The tunnel would reduce traffic on NH-16 and cut a 10 km distance to 5 km from the existing 15 km between Visakhapatnam and Simhachalam temple. Varaha Lakshminarasimha Swamy is the presiding deity of the famous temple.

Post
Work on Panipat-Jalandhar h’way delayed

Work on Panipat-Jalandhar h’way delayed

Though the toll rates on Panipat-Jalandhar highway have been hiked for the road users, widening work on the highway has been delayed and the concessionaire company is badly maintaining it, forcing the motorists to face hardhips.

Post
PSC inspects road works in Longleng of Nagaland

PSC inspects road works in Longleng of Nagaland

The Phom Students Conference (PSC) has praised the Mohan Singh company, which has taken up road works in Longleng district in Nagaland. Stating that despite heavy downpour and unfavourable weather conditions the work by Mohan Singh Company was going on in full progress.

Post
Proposal to stop toll collection on incomplete roads

Proposal to stop toll collection on incomplete roads

A proposal has been made to the government to stop private developers from collecting toll on highway widening projects during the construction phase, if the project falls behind schedule. The proposal has been made by the National Highways Authority of India (NHAI) and it is being studied by the Union Ministry for Road Transport and Highways.

Post
NHAI tells govt to cancel stalled road projects amicably

NHAI tells govt to cancel stalled road projects amicably

The National Highways Authority of India (NHAI) has suggested the Union Highways Ministry to see that the road project contracts are cancelled amicably than wasting time in trying to revive the projects. And it also urged the Ministry to deal with the developers in a way that the project contracts are cancelled amicably.

Post
Rs 2,029 cr for 4-laning of Kaithal-Rajasthan border h’way

Rs 2,029 cr for 4-laning of Kaithal-Rajasthan border h’way

The Union Cabinet Committee on Economic Affairs has given its approval for four-laning of the Kaithal Rajasthan border section of National Highway-152/65 in Haryana under the National Highways Development Project (NHDP) Phase IV, on Design, Build, Finance, Operate and Transfer (BOT/DBFOT) basis in Build-Operate-Transfer (BOT) (Toll) mode of delivery.

Post
Rs 116 cr for road works, rail bridges in Hoshiarpur

Rs 116 cr for road works, rail bridges in Hoshiarpur

In Punjab's Hoshiarpur district railway over bridges and roads will be strengthened and renovated at a cost of Rs 116.77 crore, said the district's Deputy Commissioner Varun Roojam on September 3. Works will also be undertaken to strengthen link road connectivity and ensure hassle free movement of traffic, Roojam added. 16.50 kilometre road connecting Binewal and Khurali villages is being strengthened and widened at a cost of Rs 11.55 crore, he added.