SJVN has signed an MoU with Hindustan Salt Limited to Conceptualise, Structure, Implement, Operate and Maintain the Ultra Mega Hybrid Renewable Energy (Solar & Wind) Park at Salt Pan Land in Kharaghoda, Gujarat.
This proposed park will be developed on the surplus salt pan land of Hindustan Salt Limited which has generation capacity of 4000 MW to 5000 MW (solar power between 3500 – 4200 MW and wind power between 600-800 MW) when fully commissioned. At the initial stage, SJVN will develop all the infra-¡structure facilities like roads, drainage system, power supply, water supply system, eva-¡cuation arrangement from the plot to evacuation sub-station.
The MoU was signed by SJVN CMD RP Singh and HSL CMD AK Jain.
Leave a Reply
You must be logged in to post a comment.